Work Procedures
Preparation Before Bricklaying
To ensure the speed of construction work and the quality of the structure itself, it is important to pour the foundation slab or foundation strips with precision. Apply a waterproofing membrane to the foundation slab and strips before bricklaying.
General Instructions for Bricklaying
Bricklay at an ambient temperature above +5°C. We recommend using PORFIX masonry mortar for bricklaying. The approximate consumption of masonry mortar is 17 kg/m³ of masonry for PDK blocks and 20 kg/m³ for smooth blocks. Apply the masonry mortar evenly to the joint surfaces of the blocks using a notched trowel so that a joint of no more than 2–3 mm is formed after the block is laid. Use 75 mm thick partition blocks only for structures suitable for this material.
Mixing the masonry mortar
Pour the dry mixture of PORFIX masonry mortar/adhesive for aerated concrete into a clean container with water (the exact amount of water is specified on the packaging depending on the manufacturing plant). Mix into a homogeneous mass and use within 4 hours. If using masonry mortar from another manufacturer, ensure that the mortar is suitable for aerated concrete.

Setting Up the Structure
- Use a leveling instrument or laser level to identify any unevenness in the ground, and position the first block so that it aligns with the highest point.
- Mark out the sides, measure the diagonals, and, if necessary, correct any inaccuracies in the diagonals (using a measuring tape or laser distance measurer).
- Install the corner blocks and then, using lime-cement mortar, check the height with a leveling instrument or laser level. Recheck the lengths and diagonals. If you are using smooth blocks for masonry, join them on vertical surfaces using PORFIX masonry mortar. When using pero-drážka (tongue-and-groove) blocks, do not apply masonry mortar to the vertical joint, as it is dry.
- Level any minor unevenness in the first row with a plane. Remove dust and any debris from the blocks before applying masonry mortar.



Building exterior walls with PORFIX blocks
After leveling (using a scraper on aerated concrete) and cleaning the laying surface, apply PORFIX masonry mortar evenly across the entire surface to both horizontal and vertical joints (except for tongue and groove system with recessed blocks) using a notched trowel. Ensure that the joints are ideally approximately 2 mm wide. It is important to properly interlock the blocks. The overlap of vertical joints must be at least 100 mm.
Use a string line or spirit level to continuously check the horizontal and vertical alignment of the walls. If you are installing door frames during masonry work, check the width of the openings once the wall reaches a height of approximately 1.5 m.
Masonry of Partition Walls
When building partition walls, it is important to ensure their proper bonding and anchoring to the perimeter walls.
- Anchor load-bearing partitions using a "braced" method.
- Connect non-load-bearing partitions to the load-bearing structure using a so-called permanently flexible joint. Leave a one-centimeter gap between the non-load-bearing partition and the load-bearing wall or ceiling, and fill it with polyurethane foam. Anchor the partitions using a steel angle bracket. It is always advisable to place them on an asphalt insulation strip.
Expansion Joints in Masonry
Create expansion joints along the entire height of the masonry—in the perimeter wall every 24 meters—and in partitions at intervals of no more than 6 meters.
Protection of masonry
We recommend protecting aerated concrete and unfinished, unroofed structures from rain by covering them with a waterproof material (e.g., plastic sheeting).
Plastering PORFIX Masonry
When plastering, it is important to measure the moisture content of the masonry before plastering. If the moisture content by weight exceeds 20%, you must account for greater volume changes, which requires a more flexible plaster, or reinforce the entire surface with mesh... The same applies, to an even greater extent given the dimensions, to exterior plastering. When applying the selected plaster, follow the plaster mix manufacturer’s instructions strictly (layer composition, product combinations, outdoor conditions, application procedure...).
Even if the masonry is sufficiently dry (moisture content below 20%), we recommend using mesh in exposed areas (material transitions, in the corners of openings, under window sills, and at the junctions of non-load-bearing partitions with the ceiling/load-bearing masonry).
Practical Application of U-Profiles
Load-bearing lintels embedded in PORFIX U-profiles
Load-bearing lintels cast into PORFIX U-profiles are used to span openings in both exterior and interior load-bearing walls.
The lintels are constructed directly on-site by inserting reinforcement into the prepared, supported PORFIX U-channels, which are bonded together. If the U-profiles are used as lintels on the exterior load-bearing wall of a building that will not be retrofitted with insulation, insert 80 mm thick thermal insulation into the U-profile on the exterior side (thermal insulation does not need to be inserted in interior load-bearing walls or exterior load-bearing walls of buildings that will be retrofitted with insulation). After placing the reinforcement, pour concrete of class C20/25 into the load-bearing core.
Basic technical parameters
- Reinforcement – consists of main tensile reinforcement (designed by a structural engineer based on the load) and a connecting stirrup (E6) as shear reinforcement. The spacing between stirrups is 100 mm and the reinforcement cover is at least 16 mm; the embedded reinforcement must be free of rust, corrosion, and debris
- Maximum opening width (Lo): 3,000 mm
- Lintel support on masonry: min. 250 mm / for lintels made of U-profiles without thermal insulation
- Min. 375 mm – for lintels made of U-profiles with thermal insulation
Expected load-bearing capacity of lintels – will be achieved 28 days after concrete placement.
Installation of Load-Bearing Lintels
To ensure proper installation and positioning of the lintels, the installation direction is marked on each one—with the arrow pointing down (load-bearing reinforcement at the bottom). Lintels with a length of 1.20 m can be handled manually. Lifting equipment is required for handling longer lintels. We recommend installing the lintels using PORFIX adhesive. After assembly, a lintel composed of individual load-bearing lintels must be secured against tipping at least every 900 mm using steel clips made of crimped steel with a minimum diameter of 12 mm, or by tying through the lifting eyes. The clamping points should be located at the center of the lintel in terms of height. PORFIX ceiling beams can be laid directly on a lintel secured in this manner with a minimum support span of 150 mm. The securing clips may be removed only after the concrete has hardened.
Load-bearing lintels on the perimeter wall
For retrofitted buildings, it is not necessary to address the insulation of the lintel itself. If the building is not retrofitted with insulation (when using PORFIX PREMIUM P2-400 blocks with a width of 375 or 500 mm), the lintel must be insulated so that the bearing surface of the floor beams is on the lintels. Two 100 mm wide lintels must be supported from the interior side.
Procedure for installing the ceiling structure
Handle ceiling beams and ceiling inserts with extreme care, as any damage may negatively affect the structural integrity of the ceiling structure.You can install the ceiling structure directly on the load-bearing wall blocks. Install the ceiling beams by hand or using machinery in 600-mm increments, in accordance with the ceiling layout drawing. The minimum spacing is 150 mm, and the maximum room span is 7,700 mm.
- Support the installed ceiling beams with temporary supports spaced no more than 1,600 mm apart, so that a camber forms in the middle of the beam—until one end of the beam begins to lift. Ensure the stability of the support system by bracing diagonally to the studs and nailing boards in two non-parallel directions. Do not place supports on frozen ground. If there is increased parallel loading on the ceiling from a non-load-bearing partition, place at least two beams under this partition.
- Place the ceiling panels on the prepared beams in a perpendicular direction only after the supports have been installed. You can also place the ceiling panels of the outer bay with one side resting on the masonry (min. 20 mm) and the other side on the ceiling beam. The panels are installed dry
- Place transverse structural reinforcement on the installed ceiling panels—at least a mesh with 200 x 200 mm openings and 6 mm wire, which you secure with rebar wire to the longitudinal beams
- After formwork removal, fill the gaps between the ceiling panels with concrete and also pour a 50 mm thick concrete slab—this must be poured in a single layer. Aerated concrete absorbs moisture, so moisten the ceiling panels with water (approx. 4–6 L/m²) before concrete placement. We recommend concrete of at least class C20/25. When transporting the concrete mix over the installed ceiling panels, use wooden planks. The entire structure must be poured as a single unit without any construction breaks, including the ring beams
- At outdoor temperatures between +12° and +20°, the ceiling can be loaded no sooner than 28 days after it has been poured. At temperatures below +12°, the curing time will be extended proportionally. We do not recommend pouring concrete at temperatures below +5° without the necessary additives. Remove the supports once the concrete has sufficiently hardened.